In August of 2020, Big Basin was dramatically changed by the CZU Lightning Complex Fire. With almost all park facilities and trails lost in the fire, there are now opportunities to plan and build a renewed park that is designed to increase equitable access to the park and to increase the health and resiliency of the forest. The vision for the renewed park is described in the Reimagining Big Basin Vision (Exhibit A) which is helping to guide ongoing development of the parks Facility Management Plan. The Big Basin Redwoods Facilities Management Planning is the park plan to guide future rebuilding of recreational facilities after the CZU Fire. This plan is expected to be completed in June 2025 and includes the development of conceptual alternatives to evaluate distinctive strategies for site configuration and use. For additional information please see Exhibit A or visit https://reimaginingbigbasin.org/.
Note: Current access to the site is limited due to the destruction of infrastructure during the CZU fire. Alternative access routes through easements on neighboring properties are not available. We are requiring all bidders to complete a site visit before developing proposals in order to have a full understanding of access limitations to staff and equipment access. Preschuduled options are February 12 9:00 am-5:00 pm or February 18 from 9am-5pm or February 28 8:30 am to 3:30 PM (potentially bidders may attend more than one visit, but only one is required), meeting at the Rancho del Oso Welcome Center and Campground (https://maps.app.goo.gl/vGThvazDFU52Nrds6) The yellow gate on Highway 1 will be unlocked, but make sure to close it after you enter. Make your way up the road to the parking lot next to the campground. The ~ 6-to-7-mile hike will take most of the day so please bring plenty of food and water. You should expect to run into some poison oak, heavy brush, and downed trees so dress appropriately. The entire trail corridor has had no hazard mitigation or maintenance since the 2020 fire so it’s important to come prepared. Please reach out to Angie Gruys with any questions.
Proposals are due by March 19 at 4:00 PM and must be delivered in person per the Waddell RFP and Addendum instruction documents to:
Resource Conservation District of Santa Cruz County
Attn.: Waddell Watershed Restoration and Trail Rehabilitation Project RFP
820 Bay Avenue, Suite 136
Capitola, California 95010
Request for Proposal Documents
Exhibit A_ Big Basin Vision Summary.pdf
Exhibit B_ Roads and Trails Handbook.zip133.34 MB
Exhibit C_ Balance Legacy Roads Memo 2024-09-26.pdf
Exhibit D_ Trail Structure Sites and Description.pdf
Exhibit E_ Floodplain Reconnection Memo 2024-10-01.pdf
Exhibit F_ CGS Project Memo 01072024.pdf
Exhibit G_ Big Basin Forest Managment Strategy.pdf
Exhibit H_Draft Canyon Road-Road to Trail Log
Exhibit I_Example Optional Scope of Work
Addendums (2)
Addendum 1 Attachments
1.
Proposed Content and Selection Process (2 pages)
2.
Consultant Services Agreement Template (20 pages)
3.
Field Visit Questions (2 pages)
4.
Pre-Proposal Site Visit Sign-In Sheets (2 pages)
Addendum 2 Attachments
1.
REVISED Waddell RFP (10 pages)
2.
Draft Canyon Road - Road to Trail Log (Exhibit H) (Excel Sheet – 8 tabs)
3.
Example Optional Scope of Work (Exhibit I) (2 pages)
4.
Pre-Proposal Site Visit Sign-In Sheets 2/28/2025 (1 page)
In close coordination with California State Parks (CDPR or CSP), the Resource Conservation District of Santa Cruz County (RCD) is requesting proposals for professional services to complete a feasibility assessment and develop a preliminary design for rehabilitation and restoration of the Skyline to the Sea Trail corridor accessed via Waddell Canyon Road. The project is located in Big Basin Redwoods State Park and accessed via the coastal unit of Rancho del Oso.