This project consists if improvements to road drainage utilizing road shaping methods and installation/upgrade of existing road drainage structures to normalize hydrology and prevent or minimize the chronic delivery of road surface, ditch, and cutbank-derived fine sediments. The proposed project actions include adding seven (8) reverse grade dips to reduce concentrated flow on the road surface, insloping the road to an existing inboard ditch, removing and replacing or cleaning several ditch relieve culverts and replacing one stream crossing culvert.
Addendum 1 Amber Ridge Loop Sediment Reduction Project (Amber Ridge Loop Drainage) - 4 Pages
Addendum 1 Attachments
Attachment 1 - Revised Bid Sheet (1 page)
Attachment 2 - Rock Classes (1 page)
Attachment 3 - Pre-Bid Sign-in Sheet (1 page)
There will be a mandatory pre-bid walk on Monday, July 22 at 1:00 PM at the project location in Boulder Creek, CA – MEET AT the Tree House Café 13266 CA-9, Boulder Creek, CA 95006 to caravan to the site. Bids will not be considered from Contactors who are not represented at the meeting.
Sealed bids will be received until Wednesday, July 31, 2024 at 11:00 AM at the District office at 820 Bay Avenue, Suite 136, Capitola, CA 95010
A public bid opening will be held on Wednesday, July 31, 2024 at 11:00 AM at the District office at 820 Bay Avenue, Suite 136 Capitola, CA 95010